Robert A. Young Famous Quotes
Reading Robert A. Young quotes, download and share images of famous quotes by Robert A. Young. Righ click to see or save pictures of Robert A. Young quotes that you can use as your wallpaper for free.
In order to complete any successful and streamlined qualification effort, a comprehensive plan should be developed which bridges the GEP/commissioning phases with the qualification phases of the project.
Front end loading with appropriate resources provided time to reflect and produce needed changes and alignment around the C&Q approach.
Using the risk-based approach presented by the ISPE Guide (i.e., system and component level classification) limited qualification activities to verifying and testing critical aspects of direct impact systems and their critical components.